The steel structure
– for the Kopex companyThe subject of the agreement was to conduct a comprehensive quality monitoring of the execution of the steel structure for the power unit in the Power Station Jaworzno.
Characteristic:
-
Construction:steel structure of the power unit with a total weight of 15 000 tonnes
-
Construction:production of the steel structure by the subcontractor of Employer
-
Destiny:for newly built power unit with a capacity of 910 MW in the Power Station Jaworzno III

The steel structure
Scope of work
Quality supervision of the execution of the components of steel structure, substantive verification and evaluation of the documentation from inspection and quality tests; checking compliance of the structure with the project, checking the quality of materials, control of the timetable for the various stages of the task, the presence on the technical acceptance, reporting.
Customer
KOPEX S.A.
Nasze realizacje