Construction of water network Joanka-Dopiewiec
– Stage IIAThe subject of the contract was Investor’s Supervision in the implementation of tasks: Construction of water network Joanka-Dopiewiec Stage IIA along with the restoration of the surface.
Characteristic
Branża drogowa:
realization of the temporary traffic organization project on the county road Dopiewo-Konarzewo
construction of a water supply system made of pipes PE100 RC SDR17 PN10 double-layered with a diameter of DN40 mm with a total length of 2 102,1 m
installation of the pipeline under the motorway in the existing casing pipe
installation of aeration and venting valves DN 80 mm for working pressure PN10
installation of underground hydrant DN 80 mm PN 10 with stainless steel shut-off plate and shut-off gate valve
assembly of DN 400 wedge gate valves with a telescopic casing
profile milling for depth 1-4 cm
making the leveling layer of asphalt concrete
making a wear course of asphalt concrete
construction of the road surface on the extensions along with the foundation of broken aggregate
implementation of thin-layer horizontal marking
.jpg)
Construction of water network Joanka-Dopiewiec
Scope of work
Construction supervision in all industries
Customer
Department of municipal services Sp. o.o. based in Dopiewo
References
Exceptional Talent
-d9d616a8.jpg?src=images/realizacje/infrastruktura-techniczna/siec-wodociagowa-joanka2/20171006_102123%20%28Copy%29.jpg&thumbnail=1500,650,&hash=bb00002f)
.jpg)
-c7726f80.jpeg?src=images/realizacje/infrastruktura-techniczna/siec-wodociagowa-joanka2/180108_081911_1%20%28Copy%29.jpeg&thumbnail=715,450,&hash=85ff2c0f)
.jpeg)
-c3a3bdd3.jpg?src=images/realizacje/infrastruktura-techniczna/siec-wodociagowa-joanka2/20171205_131158%20%28Copy%29.jpg&thumbnail=715,450,&hash=4998c429)
.jpg)